Blockwork and Floor beams at Newton Poppleford

The groundworkers, CSD,  have been busy since the begining of January digging trenches to get the services and drain connections in place at Beech Drive. The road layout throughout the site is currently going in and joining us on to the main road. Now that the blockwork and floor beams are also down in Plots 1 and 2 you can see the scale of these properties and what a great size these 4 bedroom homes are going to be!

They are now focusing on Plot 3 so keep your eyes on this page over the next week or so to see the house rise out of the ground!

Now that the floor beams are down its amazing the speed in which the brickwork will go up to start really shaping these homes.

 Plot 1 to the right of the image is the footprint of the garage

Plot 1 to the right of the image is the footprint of the garage

 Looking at the front of the property on Plot 1

Looking at the front of the property on Plot 1